-
Closed
-
How can I change the order in which the slides show in Elastic Slider? It is showing the latest slide I added first, but I want it to show the first one I added first. I checked in both the theme options and the customize menu and there doesn’t seem to be a way. I do not want to use the other sliders. Thanks.
The topic Change Order of Slides in Elastic Slider [Alora] is closed to new replies